Home >

BEST PRACTICES FOR ENERGY EFFICIENCY IN MICROSOFT DATA CENTER OPERATIONS

4. March 2011

In the past, the cost of physical space was a primary consideration in data center design. More recently, the cost of power and cooling has risen to prominence. Data center managers now must prioritize investment in efficient power and cooling systems to lower the total cost of operating (TCO) of their facilities.

 

Download this document:

Energy-Efficiency.doc (1.85 mb)

Add comment

  Country flag

biuquote
  • Comment
  • Preview
Loading